LEEDing to Unintended Consequences - The Ghost of LEED Future

As discussed previously, USGBC has imposed extended reporting requirements as part of its minimum program requirements for LEED. It appears the extended reporting already adopted may only be an initial step. We may see extended reporting requirements backed up by decertification; we may see on-going recertification as a basic part of LEED program structure.  I admit this is speculative, but we may be seeing a shift from LEED using energy modeling towards an actual performance model.

Given the overall goal of improved building performance implicit in LEED, these changes and speculated upon shifts may make sense technically. These changes, however, raise some significant questions regarding risk and responsibility. The ultimate impact on risk, and thus embedded costs, of these changes may vary dramatically from state to state because of each state's underlying legal framework.  Placing these changes into the complex network of construction contracts, contractual allocations of risk, and shared responsibilities raises some interesting observations and questions:

  • States whose limitations period runs based on "injury", such as Virginia, may experience extended limitations triggers where building performance is alleged to be the failure; such results could be different for the various players depending on their roles
  • In damage trigger states, courts may find that "injuries" were suffered far earlier than owners even suffered performance problems, so results in these states are difficult to predict and there could be big winners and losers
  • States with discovery based limitations accrual, such as Maryland and the District of Columbia locally, will present cases with ever longer, potentially plausible, arguments regarding why the owner "reasonably did not know" of a problem for years after occupancy of the project
  • The timing issues presented by extended performance questions mean that contractual agreements on statute of limitations and when they start to run should be focal points of contract negotiations; negotiations regarding extended warranties will be pivotal as well
  • The growing use of LEED certification in various local zoning approvals means decertification may carry unintended consequences. If a project is decertified, is there a possibility that its occupancy permit is threatened?
  • The potential for decertification, or a failure to participate in recertification if that becomes standard, may place commercial landlords at potential for extended risk of breaches of lease agreements depending on the LEED requirements imposed
  • Lease agreements in turn need to be carefully worded so that all parties are on the same page as to exactly what is the yardstick and time frame for complying with LEED related terms

These are just a few of the wrinkles that come the mind when one places an overlay of extended performance obligations into the context of LEED.  We will keep a close watch on these developments moving forward.  We believe that continued movement on the extended performance axis by USGBC will have some serious economic impact on the financial aspects of LEED projects, who "wins" and who "loses" based on these changes, and where bottlenecks may develop on the economic risk side of the equation in reaction to extended performance obligations.

Trackbacks (0) Links to blogs that reference this article Trackback URL
http://www.valanduseconstructionlaw.com/admin/trackback/156883
Comments (7) Read through and enter the discussion with the form at the end
Christopher G. Hill - September 21, 2009 9:31 AM

Great post as always Tim. I'm glad that you have joined the ranks of Blawgers. You identify several issues. Another issue inherent in all of this is that the owner, tenants, and anyone else using the building must maintain the building. A contractor could build a sustainable, energy efficient building, but without proper maintenance, the building won't meet the performance goals. To put this burden on a contractor, or even an architect, when maintenance is such a huge issue, could lead to interesting results.

Tim Hughes - September 21, 2009 10:47 AM

Thanks for another great comment Chris!

Add in the end user tenants into the equation, and this on-going performance issue can turn into quite the causation mud wrestling match.

Imad Naffa - September 21, 2009 11:49 AM

Another great article Tim!

I'm learning a lot from the legal aspect of things related to LEED.The comments that follow this post will also be very interesting to read.

Keep up the great work!

Imad

Christopher G. Hill - September 21, 2009 12:38 PM

Not to mention visitors (especially in retail spaces)

Tim Hughes - September 21, 2009 3:10 PM

Imad - thanks for the comment. Law and construction definitely go hand in hand. Whether that is fortunate or not depends on one's point of view, but it is reality.

Chris - the transient users/visitor exposure piece is always a bit tough to get a bead on. I think in the general LEED claim exposure sense, it feels pretty tenuous. In the grander sense of environmental claims, such as mold personal injuries for example, the design of a green building certainly implicates those issues (and hopefully reduces their risk ...).

Christopher G. Hill - September 21, 2009 4:51 PM

I guess my thought is what happens with issues as simple as someone leaving a shopping cart on the door opener pressure pad, thus lowering energy efficiency? All these issues in the aggregate make public spaces and time horizons for energy efficiency scary at times.

Tim Hughes - September 21, 2009 5:39 PM

That really is a great point. Everyone that uses or visits the building would in fact potentially impact its performance.

Thanks for following up!!